INSTALLATION
The LevelDek system can be installed by our own highly experienced teams or by independent contractors. Our scope of work includes all of the installation process up to and including the manifold. We fill the system with water, purge and pressure test before installing the substrate above.
LevelDek is quick and easy to install as the New Era cradles and battens are swiftly positioned to the correct height. The heating panels then sit directly on the supporting saddles and are automatically aligned.
Once the heating elements are in position the pipe is installed by clipping it into the Omega shaped channels. T&G chipboard or ply deck can be installed and simply screwed down. The LevelDek saddle acts as a perfect separator to prevent wood on wood squeaks.